Welcome to the East Island Aviation Downloads page. Here you will find all of our publicly available information.
For easy downloading of these files, right-click on the link and select “Save Link As…”
These files are all in Adobe PDF format for easy viewing.
- Commute-A-Walk Brochure
- Corporate Qualifications
- DASH-8 Boarding Gantry Brochure
- Fall Protection Brochure
- FDR Safety Report
- Airside Painting & Line-Striping Qualification
- Regional Boarding Ramp Brochure
East Island Aviation has uploaded two new slide presentations to the website. This first presentation takes you one a tour of our manufacturing facility. See our factory in action building passenger ramps, walkways and gantries from initial fabrication to final assembly.
Welcome to our facility.
Pre-assembly area. Cutting machining, etc……
Assembly area # 1
Raw material pre-fabrication area
Laser Machines
Fabrication of Walkway structures
Powder Coating Building
Parts entering Powder Coating Oven
Parts waiting for Powder Coating
Walkway side panels waiting to be painted
Special Coating application
Assembly Jig
Passenger Gantry fit-checked to a mock-up DASH-8 aircraft silhouette
Build area # 1. Assembly jig and mock-up Boarding Ramp in the background
Canopy Hood in jig for final assembly
Q-Ramp in initial design stage
Q-Ramp being fitted with height adjustment device
Final mock-up of Q-Ramp
Assembly area # 2 …..Six Regional Boarding Ramps waiting for fitment of electronics & hydraulics
RBR’s being fitted with electronic control circuitry
RBR’s being fitted with Hydraulic Drive Systems
Final Assembly of Regional Boarding Ramps (RBR’s)
Six RBR’s ready to ship to Miami Int’l Airport
Assembly area # 3 – Mobile Boarding Ramp in development for ANA in Japan
Assembly area # 3 – Two Passenger Gantries in final inspection for Qantas Airlines
Passenger Walkway Transition Decks waiting to ship to Los Angeles Int’l Airport
Custom Stainless Steel Commute-A-Walk passenger walkway for Nagasaki seaport in Japan.
Walkway sections waiting for “Q C” inspection before shipping
Custom Walkway for Delta Airlines “fully assembled” for inspection
Shipping wing of the factory
Toronto Passenger Walkway & 3 RBR’s “fully assembled” for inspection . Client: American Airlines
Custom Switch-back Gantry for American Airlines. Gantry will interface the new EMB-175 aircraft to Regional Boarding Ramps
Delta Airlines LaGuardia Airport 3rd level Bus Ramp “fully assembled” outside the factory for inspection by the client
The second presentation will give you a better understanding of our full line of products and field services, in, and around the Terminal. See our highly skilled & experienced field service technicians as they install FIDS monitors, assemble three story terminal ramps, rig loading bridges and PC Air units just to name a few!
2nd Level Bust Ramp to US Customs Arrival Delta Airlines JFK
Passenger Bus Shelters under construction – Delta Airlines
US Customs Ramp & Shelters completed
Inside of passenger corridor
Bus Ramp and Shelter for Departure Gates Terminal 3 JFK
Domestic Arrival Ramps & Shelters Delta Bus Operation JFK
US Customs arrival, domestic arrival and domestic departure Ramps & Shelters. Delta Airlines Bus Operation JFK
Port Authority T-4 Bus Shelters
T-4 Bus Shelters
Terminal C/D Passenger Transfer Ramp completed. Delta Airlines LaGuardia Airport
Inside of Passenger Walkway
Gate # 19 , Terminal #2 JFK Bus Ramp
Installation of 500 FIDS monitors Terminal # 4 JFK
Replacement of old style tube FIDS with flat screen displays
Flat screen FIDS display wall near completion
Custom FIDS Tower and Flat Screen Display(s)
American Airlines Pilot Ready-Room FIDS installation
Custom FIDS Tower and monitor install with custom rear enclosures
JFK Control Tower: Consoles, Data & Comm, Electrical, and IT hardware installation
Control Tower completed JFK T-4
Kiosk millwork installation and IT equipment
Custom back-lite Ticket Counters – Newark Liberty Airport
Delta Airlines JFK Millwork and IT installation Arrivals Hall
Terminal #4 JFK Int’l Airport General Construction services
General Construction Products
General Construction Services – 14 complete bathroom renovations (plumbing, HVAC, electrical, carpentry, etc.)
Custom Ramps & Passenger walkway T-2 JFK, Delta Airlines
17 Gate Passenger Walkway Delta Airlines
Commute-A-Walk retractable passenger walkway – Matsuyama, Japan
Inside the Commute-A-Walk Passenger Walkway
Commute-A-Walk in use at Nagoya Airport in Osaka
Commute-A-Walk in Shizuoka Japan.
Commute-A-Walk Hard-Stand operation in Bermuda
Commute-A-Walk in Melbourne, Australia
Commute-A-Walk in double configuration
Commute-A-Walk for Rear Deplaning. United Airlines (LAX) , SAS (Stockholm, Sweden)
Regional Boarding Ramps: Boston Logan Airport
Regional Boarding Ramps in Northwest Arkansas Airport and Asheville Regional Airport
Regional Boarding Ramps with Pre-Condition Air & Ground Power
Regional Boarding Ramp docked to a DASH-8 / 400
Regional Boarding Ramps in winter operations Toronto Airport, Canada
Modular Wall panels to create a designated passenger corridor to Regional Boarding Ramps
DASH-8 Gantry in Fukushima , Japan for ANA
Passenger Gantry in Phoenix Sky Harbor Airport
1st generation Passenger Gantry in Atlanta
EMB-145 Jet Bridge Adapter
Mobile (drivable) Passenger Boarding Ramp Kagoshima, Japan
Mobile Passenger Boarding Ramp during a fit-check on a JAL DASH-8
QantasLink Q-Ramp in Sydney. Purpose built to be maneuvered by only one ground agent.
Ground Support Services PC Air Installation
General Airside services.
Passenger Boarding Bridge Services.
Aircraft Line Striping Services
Line Striping 74 Gates for United Airlines in Newark Liberty Airport
Feel free to Contact Us for a more in-depth and comprehensive understanding of how East Island Aviation can help you improve you terminal environment and efficiency.